Update Glen Eagle Resources



Montreal, Quebec - TheNewswire - November 25, 2020 - Glen Eagle Resources Inc. (TSXV:GER) ("Glen Eagle" or the "Company") is pleased to announce that a second drill rig has arrived at Cobra Oro gold processing plant in Honduras. Both drill rigs will relocate to their respective site as soon as the roads are cleared from mudslides caused by recent hurricanes. The 2000 meters drilling program, of which 500 meters has been completed, is expected to resume very shortly with the arrival of the dry season. Production will also resume at about the same time.

Several pictures were recently taken and downloaded on the company's website showing that the entire plant site did not sustain damages. The Company also tackled under difficult circumstances two months of renovations and maintenance to have the plant ready to operate under optimum conditions as illustrated on Glen Eagle's website.

https://gleneagleresources.ca/pictures/#OptimizationPlant

https://gleneagleresources.ca/pictures/#DrillRigs

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Jean Labrecque, President

Glen Eagle Resources Inc

2075 Victoria Street

Suite 201

St-Lambert, Quebec

J4S- 1H1

514-808-9807

Copyright (c) 2020 TheNewswire - All rights reserved.

Data & News supplied by www.cloudquote.io
Stock quotes supplied by Barchart
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.